• AC Line Reactor
  • AC Line Reactor
AC Line Reactor

Brand: OLEE

Product origin: Foshan China

Delivery time: 20 working days ( MOQ 50 PCS )

Supply capacity: 5000 sets per month

Ouli AC Line reactor is added to the input of the drive and placed in series with the incoming line. They help to mitigate harmonics and because they are between the line and the drive, they are able to act as a buffer for surges and other transients.

Download:

AC Line Reactor


Ouli AC Line reactor is added to the input of the drive and placed in series with the incoming line. They help to mitigate harmonics and because they are between the line and the drive, they are able to act as a buffer for surges and other transients.


The materials used in the products have passed strict supplier qualification review and sample testing. 


The product design combines the actual application and technical requirements of customers, from cost, structure, comprehensive consideration of craftsmanship, appearance, ease of installation and use, etc., to provide customers with the best design solutions. 


Ouli complete production and testing equipment, quality control system, ERP management system, and professional sales team ensure our commitment of delivery and service quality to customers.


Ouli AC Line Reactor 

Features:

  • Protects from damaging voltage drop

  • Reduces surges and spike currents

  • Longer life and solid state components

  • Smaller size and lighter weight

  • Flexible design and construction

  • Higher efficiency

  • Lower vibration and noise 

  • Lower iron loss and temperature rise

  • Simple installation and disassembly

  • Manufacturing under ISO 9001, ISO 14001 and ISO 45001 certified Ouli facilities

  • RoHS Compliant


Discription

StandardIEC 61558
Input Voltage As Customer Requirements
Output VoltageAs Customer Requirements
Frequency50/60Hz
Winding Material
Copper or Aluminum 
Insulation Class B 130℃, Class F 155℃, Class H 180 ℃ and other as customer requirement
Cooling MethodAN/FN
InductanceAs Customer Requirements
Reactor CurrentAs Customer Requirements
MOQ 50 PCS
Lead Times15~25 workding days 
Payment T/T, L/C
ServiceOEM/ODM/Customize
OthersAs Customer Requirements



Related Products
Product Tag
Get the latest price? We'll respond as soon as possible(within 12 hours)